Production Scheduling & Delivery Control

Transparent scheduling. Real-time tracking. On-time delivery.
Home / Production Scheduling & Delivery Control

Poor scheduling leads to

Delayed shipments

Mixed-style production chaos

Material and mold bottlenecks

Quality inconsistency and rework

READSUN 9-Step Production Scheduling System

Step 1

Frame Specification Lock

Frame model, size, lens type, material (acetate, TR90, titanium), hinge style and logo method are confirmed before scheduling.

Step 2

Mold & Tooling Scheduling

3D files, CNC, EDM and T0–T2 mold validation are aligned with acetate cutting, injection and metal machining timelines.

Step 3

Eyewear Material Planning

Acetate sheets, TR90 pellets, titanium wire, hinges, nose pads and temple tips are scheduled with supplier lead times.

Step 4

Frame Production Line Setup

Injection, CNC cutting, milling, polishing, coloring and laser engraving lines are balanced for frame complexity.

Step 5

Fit & Finish Sample Approval

PPS samples verify frame size, temple tension, hinge movement, color and surface finish before mass production.

Step 6

Frame Manufacturing

Injection or cutting, CNC shaping, polishing, coating, hinge assembly and logo marking are executed in sequence.

Step 7

Optical Frame Quality Control

Frame alignment, hinge strength, surface defects and dimension accuracy are checked through IQC, IPQC and FQC.

Step 8

Eyewear Packing & Labeling

Frames are cleaned, packed, labeled with SKU and batch codes, and recorded in ERP for traceability.

Step 9

Shipment & Online Tracking

Customers can track mold status, frame production progress and shipping dates through our online system.

How We Keep Delivery Stable

In-house mold center

no outsourcing delays

Safety stock for key materials

TR90, acetate, Ultem, metal parts

Multiple production lines

flexible switching for urgent or hot-selling orders

FAQ

Q:

How long does it take from order to shipment?

A:

For standard eyewear models, production usually takes 20–35 days. If new molds are required, mold development and frame production are scheduled in parallel to minimize delays.

Q:

Can you handle multiple styles in one order?

A:

Yes. Our mixed-line scheduling system allows multiple frame styles, colors and materials to be produced together without waiting for full batch quantities.

Q:

What if we need urgent or fast delivery?

A:

We offer a priority scheduling option that can shorten the production lead time by around 20–30%, depending on material and mold availability.

Q:

How do we know our order is on schedule?

A:

You can track mold progress, frame production status and estimated ship date through our online order tracking system, ensuring full transparency at every stage.

Check Your Production Slot

Tell us your frame project. We’ll tell you the real lead time.
  • 排期管理
    • *Email
      *Name
      Mobile Phone

What you’ll receive

Eyewear Production Timeline Kit
Eyewear Production Timeline Guide (by material & volume)
Frame lead time chart for Acetate, TR90, Titanium & mixed frames
Mold impact & risk checklist to identify potential delivery delays
Top 10 best-selling frames with fastest repeat production cycles
Market insights on trending eyewear styles and production planning