Delayed shipments
Eyewear Production Scheduling & Delivery Control

Poor Eyewear Production Scheduling Leads to
Mixed-style production chaos
Material and mold bottlenecks
Quality inconsistency and rework
9-Step Eyewear Production Scheduling Process

Step 1
Frame Specification Lock
Frame model, size, lens type, material (acetate, TR90, titanium), hinge style and logo method are confirmed before scheduling.

Step 2
Mold & Tooling Scheduling
3D files, CNC, EDM and T0–T2 mold validation are aligned with acetate cutting, injection and metal machining timelines.

Step 3
Eyewear Material Planning
Acetate sheets, TR90 pellets, titanium wire, hinges, nose pads and temple tips are scheduled with supplier lead times.

Step 4
Frame Production Line Setup
Injection, CNC cutting, milling, polishing, coloring and laser engraving lines are balanced for frame complexity.

Step 5
Fit & Finish Sample Approval
PPS samples verify frame size, temple tension, hinge movement, color and surface finish before mass production.

Step 6
Frame Manufacturing
Injection or cutting, CNC shaping, polishing, coating, hinge assembly and logo marking are executed in sequence.

Step 7
Optical Frame Quality Control
Frame alignment, hinge strength, surface defects and dimension accuracy are checked through IQC, IPQC and FQC.

Step 8
Eyewear Packing & Labeling
Frames are cleaned, packed, labeled with SKU and batch codes, and recorded in ERP for traceability.

Step 9
Shipment & Online Tracking
Customers can track mold status, frame production progress and shipping dates through our online system.
FAQs
- Q:
How long does it take from order to shipment?
- A:
Standard production takes 20–35 days. Delivery times vary by material:
Sheet frames (Acetate / Silicone): 60–90 days
Injection-molded/CP/TR90: 35–120 days
Metal / Titanium / Stainless Steel: 35–80 days
- Q:
Can you handle multiple styles in one order?
- A:
Yes. Our mixed-line scheduling system allows multiple frame styles, colors and materials to be produced together without waiting for full batch quantities.
- Q:
What if we need urgent or fast delivery?
- A:
We offer a priority scheduling option that can shorten the production lead time by around 20–30%, depending on material and mold availability.
- Q:
How do we know our order is on schedule?
- A:
You can track mold progress, frame production status and estimated ship date through our online order tracking system, ensuring full transparency at every stage.
Track Your Orders Easily
When our order is officially opened, you can timely know the progress of order execution through our online order tracking system,For example:in the process of production, when we have started shipping Ensure that we work efficiently and strictly Quality Assurance. Although you are not at our work site, we will let you know the progress of each order in time.
What's Your Order Status?

Order Confirmation
After each customer signs the contract, we will assign a unique order number, which can be used to track the progress of the order on our official website.

Production Scheduling
Following order confirmation, clients will have a clear understanding of the production schedule, including the start and estimated completion dates.

Material Procurement
Clients will have transparent access to the progress of material procurement, ensuring all necessary materials are ready and avoiding potential supply chain delays.

Production Process Tracking
We provide real-time tracking of the production process, including progress on the production line, quality inspections, and assembly stages.

Quality Control and Inspection
Clients will be informed of our quality control measures, including in-process inspections, to ensure products meet standards and specifications.

Packaging and Shipping
Clients will be informed about the packaging and shipping processes, including protective measures and estimated delivery dates.

Delivery and Feedback
Once the product is ready for delivery, clients will receive notification and tracking information. Upon receiving the product, clients can provide feedback to help us continually improve our products and services.
Check Your Production Slot
- 排期管理
- *Name
- *Phone
What you’ll receive

- Eyewear Production Timeline Guide (by material & volume)

- Frame lead time chart for Acetate, TR90, Titanium & mixed frames

- Mold impact & risk checklist to identify potential delivery delays

- Top 10 best-selling frames with fastest repeat production cycles

- Market insights on trending eyewear styles and production planning

- Free shipping or complimentary eyewear accessories on your first order